Now Playing Tracks

04 July 2012: An unusual sight at a synchrotron! A 12 tonne ‘telehandler’ is craned over the storage ring roof. The versatile fork lift truck is needed to move air blast coolers situated in the inner courtyard of the synchrotron building. The 10.5 metre long coolers will be connected up to the building’s main chiller system. Photo by Vacuum Technician Bill Nicholls.
Zoom Info
Camera
Canon PowerShot SX200 IS
ISO
400
Aperture
f/4.5
Exposure
1/20th
Focal Length
79mm

04 July 2012: An unusual sight at a synchrotron! A 12 tonne ‘telehandler’ is craned over the storage ring roof. The versatile fork lift truck is needed to move air blast coolers situated in the inner courtyard of the synchrotron building. The 10.5 metre long coolers will be connected up to the building’s main chiller system. Photo by Vacuum Technician Bill Nicholls.

To Tumblr, Love Pixel Union